Know where your project can go wrong — Before it does.
eazybuild checks contractor history, budget slack, permits, and timeline against real project outcomes, so problems show up on a screen instead of on a job site.
Drag any slider to see how it changes your risk picture.
The math doesn't move if your risk does.
You pay one flat fee, set before you see a single result. What actually moves is the cost of finding a problem after the ground's already broken — that's the number worth watching.
Pick any two sites. See where they actually diverge.
Risk doesn't look the same everywhere. Compare the same contractor-and-budget profile across any two of five cities.
Flagged axis: TIMELINE
Timeline slippage is the biggest risk here — buffer your schedule accordingly.
Flagged axis: CONTRACTOR
Contractor track record is driving this — worth checking references before signing.
Where Lagos and Abuja actually differ
Every axis, sorted by the size of the gap — not the order they're measured in.
We're not a replacement for your own judgment or a good contractor's advice — we're a second check. The score comes from patterns in past project outcomes, not a gut feeling, and every flag tells you exactly which factor is driving it so you can go verify it yourself.
No. You pay a flat fee for the check, set before you see any results. Nothing changes if your score comes back high or low, so there's no incentive on our end to shade it either way.